Pre-Engineered Buildings (PEBs) Conventional Steel Buildings
Structure Weight
  • Efficient use of steel = 30 % lighter - tapered build up - large depths in areas of highest stresses = Optimum
  • Light Gauge Secondary members - low labor cost
  • Standard hot rolled members - inefficient design - Heavier than required !
  • Heavier secondary members - higher material costs
  • Design
  • Quick Specialized computer analysis & design programs optimize material requirements - Drafting is computerized minimizing errors !
  • Design, shop and erection drawings are supplied by the manufacturer free of charge
  • PEB designers are pre-engineering buildings every day of the year resulting in most efficient designs
  • Ease of coordination allows for lower design and coordination fees
  • Design is made from scratch each time..with fewer design aids…error factors increase…Substantial Engineering and Detailing s required - computer programs require extensive input/output
  • Extensive consultant time is devoted to design and drafting as well as coordination at significant project costs
  • Each project is a separate case - engineers need more time to develop designs and details
  • Design and coordination are complex, extensive and time consuming raising overall design costs
  • Delivery 6-8 weeks 20-26 weeks
    Foundations Simple - Easy construction - Light weight = less cost Expensive - Heavy foundation
    Erection Simplicity systems approach = similar systems = learning curve is faster for each consequent project. Steel Buildings Co. provides on site free of charge erection support as well as on site quality control followup  
    Erection cost and Time Accurate knowledge of time and cost of erection. Erection process is easy, fast with hardly any requirement for equipment 20 % higher erection costs - difficult to estimate timing and difficult to control schedules
    Seismic Resistance Low weight flexible frames = higher resistance to seismic forces Rigid Heavy weight = low performance in seismic zones
    Overall Price As much as 30% Less Rigid heavy structures, more expensive
    Architecture Outstanding Architectural Design At low cost combined with wood, concrete, glass, aluminum Special design for each project to incorporate architectural appeal increases project timelines and adds much higher costs
    Sourcing & Coordination Buildiing is supplied as one package with erection if required - Turnkey Multiple supply sources -requiring logistical coordination and project management effort
    Cost of Change Orders Change orders are easy to respond to with minimal material waste and extra costs Substitutes and changes of components is costly and time consuming due to order dates. Redundancies often result in higher cost to the end-user.
    Building Accessories Accessories are standardized parts designed to fit the building - mass produced for economy and are available with the buildings Every project requires special design, making the components more expensive and requiring more timely preparation and fabrication affecting your project schedules
    Future Expansions Electronic records are kept indefinitely - future needs are simple to cater to Records are difficult to obtain after a long period of time
    Responsibility Single Source of Supply Multiple Responsibilities, with the consultant carrying design responsibility
    Performance Buildings designed as a system, allowing for maximum efficiency, precise fit and peak performance with dependable, predictable performance Lack of a system design creates greater room for error. Low prediction of how components act together in each unique building. Components may perform differently under different climatic conditions creating unnecessary uncertainty.
    Global Experience Steel Buildings has designed to many international codes and standards around the globe Conventional manufacturers are only familiar with local markets and local climatic conditions